The Project 

A drastic improvement was needed in one of Wales’ largest Electronic Manufacturing Plants’ toilets.

 octb4.jpg

 

The existing quarry tiles were damaged and proving difficult to clean, grout lines were grubby and unsightly.

 

 


Page provided the solution a seamless, attractive, non slip floor finish with coved skirting.

 



  octafta2.jpg

The system chosen was our trowel applied  Page Quartz+ system incorporating a decorative finish, over coated with 2 coats of a clear high build epoxy & polyurethane seal to make cleaning easier and be chemically resistant.
If you want to know more about our products or services, please give us a call to arrange a free site survey on 01443 475270.

 

 